AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-KAPU_KAKAMERI | General-purpose asbestos cardboard, grade KAON-1, thickness 4 and 6 mm | t | ||||||||||
| KAME-LI-MESA-MEPU_KAKANEME | Self-tapping steel screws, oxidized, with countersunk head and cross-shaped slot, double-start thread, pointed, diameter 3.5 mm, length 45 mm | t | ||||||||||
| KAVO-TO-KASA-KATO_KAKAKAME | Roofing sheet steel, black, thickness 0.7 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||