AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAME-METO | Precast reinforced concrete slabs | Nr | ||||||||||
| RITO-LI-KARI-KARI | Pipeline assemblies made of seamless pipes | t | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOME | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 2.5 mm | t | ||||||||||
| KAME-LI-MEME-KALI_KAMEVORI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 3 mm | t | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOTO | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 3 mm | t | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOSA | Welding electrodes for welding low-alloy and carbon steels E60A, diameter 4 mm | t | ||||||||||
| MEVO-ME-KADX-KAME_KAKAMERI | Steel ball gas valve, nominal diameter 100 mm | Nr | ||||||||||
| RITO-TO-KATO-KARI_KAKALIDX | Seamless hot-rolled steel pipes with chamfered edges, steel grades 10, 20, 35, outer diameter 108 mm, wall thickness 6 mm | m | ||||||||||
| RITO-VO-KAPU-KANE_KAKALIPU | 90° elbow with a radius of curvature R=1.5 Du for pressures up to 16 MPa, nominal diameter 100 mm, outer diameter 108 mm, wall thickness 6 mm | Nr | ||||||||||
| DXME-KAME-KAME_KATOPU | Bulldozers, power 59 kW (59.7 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAME_KAKAME | Filling and pressure testing units, flow rate up to 70 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KASA_KAKADX | Pipe layers, nominal load capacity 35 t | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MENE-KAME_KAKAPU | Mobile power stations, capacity 60 kW | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Welding rectifiers, welding current up to 500 A, number of posts 1 | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKANE | Compressors with internal combustion engines on automotive chassis, pressure up to 21.57 MPa (220 atm), capacity up to 5 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||