Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-TO-KAME-KARI | Natural sand for construction work | m3 | ||||||||||
| KAPU-TO-KARI-MEPU | Tampon binder | t | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| DXME-KANE-KASA_KASANE | Single-bucket universal front pneumatic wheel loaders, nominal capacity of main bucket 1.1 m3, load capacity 2 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAME_KARIKA | Stations for emptying soft disposable containers (big bags) complete with electric hoist and screw conveyor, hopper volume 0.5 m3 | Machine hours | ||||||||||
| DXME-KALI-KAME_KARIKA | Electricity: consumption 2.62 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KASA_KAKARI | Automated concrete batching plants, capacity 30 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 8 persons-hours/machine-hours | Machine hours | ||||||||||
| DXME-KALI-KASA_KAKARI | Electricity: consumption 18.56 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||