AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RITO-SA-KAME-KAVO | Steel pipes | km | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAVO-RI-KARI-KATO_KAKAKALI | Double-twisted rope LK-O, construction 6x7(1+6)+1x7(1+6), grade B, made of uncoated wire, marking group 1570-1770 N/mm2, diameter 15.5 mm | 10 m | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMESA | Light wire, diameter 6.0-6.3 mm | t | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUSA | Hand and lever winches with a pulling force of 14.72 kN (1.5 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUNE | Hand and lever winches with a pulling force of 29.43 kN (3 t) | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKAME | Tugs, power 110 kW (111.9 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-MEKA_KAKAPU | Floating platforms, collapsible, load capacity 29 t | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKAME | Diving stations on a self-propelled boat, power 110 kW (111.9 kW) with compressor | Machine hours | ||||||||||
| PU_MEKAKA_KANEVO | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||