AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_SAME | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-LI-KARI-KAVO_KAKAKARI | Uncoated, three-layer, open, stitched paper bags, NM brand | 1000 Nr | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KAKATONE | Welding electrodes for welding low-alloy and carbon steels E46, diameter 4 mm | kg | ||||||||||
| KARI-TO-KAME-KALI_KAKAKANE | Quartz sand, fraction 0-0.63 mm | m3 | ||||||||||
| KATO-RI-KAME-KAME_KAKAKATO | Portland cement without additives for general construction CEM 0 42.5N | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAPUSA | Black wire, diameter 1.6 mm | t | ||||||||||
| MERI-ME-KARI-KANE_MEKAKAVO | Roofing felt RKC-400 | m2 | ||||||||||
| RITO-SA-KAME-KAVO_KAKANEKA | Electric-welded straight-seam and spiral-seam steel pipes, strength class K38, outer diameter 920 mm, wall thickness 12 mm | m | ||||||||||
| RITO-VO-KATO-KAME_KAKATOME | PT steel plug, nominal diameter over 900 mm | Nr | ||||||||||
| DXME-KASA-METO_KAKAME | Flatbed trucks, load capacity up to 6 tons, with crane-manipulator, load capacity 4 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_SAMEPU | Hydraulic trailer winches with internal combustion engines for cleaning the inner surface of pipelines, pulling force 100 kN (10 t) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Mortar pumps, capacity 6 m3/h | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Electricity: consumption 1.24 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAME_KAKAME | Filling and pressure testing units, flow rate up to 70 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_KARIME | Trucks with generators, load capacity 4.5 t, generator power 30 kW | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_KATOME | KUNG type mobile workshops | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_MEKAME | Mobile laboratories for remote pipe inspection | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKARI | Dump trucks, load capacity up to 10 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKARI | Mobile screw compressors with internal combustion engines, pressure up to 1.3 MPa (13 atm), capacity up to 12 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KARIVO | Pumps, capacity 1250 m3/h, head 63 m, power 315 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KARIVO | Electricity: consumption 105.6 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||