AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEME-ME-KATO-KAME | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 20-90 mm, thickness 20-90 mm | m3 | ||||||||||
| MEME-ME-KATO-KANE | Edged board made of coniferous wood, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 30-40 mm | m3 | ||||||||||
| MEME-ME-KATO-KANE | Edged softwood board, natural moisture content, length 2-6.5 m, width 100-250 mm, thickness 44-50 mm | m3 | ||||||||||
| ME_MEKAKA_TOTO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | t | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | m3 | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | t | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEME | Ready-mixed masonry mortar, cement, M25 | m3 | ||||||||||
| KANE-ME-KAME-KASA_KAKATOSA | Single solid ceramic brick, dimensions 250x120x65 mm, grade M100 | 1000 Nr | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMEPU | Light wire, diameter 3.0 mm | t | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | m3 | ||||||||||
| MERI-ME-KARI-KANE_KAKAMERI | RKK-350 roofing felt | m2 | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXDXDX_DXDXKAKA | Construction waste | t | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||