AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KARI-RI-KASA-KAPU_KAKANEME | Crushed rock from dense rock formations for railway ballast, fraction from 25 to 60 mm | m3 | ||||||||||
| DXME-KAME-KAME_KATOVO | Bulldozers, power 121 kW (123.0 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 880 kW (894.8 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAVO_KAKAME | Trains for transporting switch block components | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKATO | Laying cranes for 25 m rail sections on reinforced concrete sleepers | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAKATO | Straightening, tamping, and alignment machines for railroad switches | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAKAPU | Machines for straightening, tamping, and aligning railroad switches, capacity up to 1200 sleepers/hour | Machine hours | ||||||||||
| PU_MEKAKA_KALIVO | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KATOME | Hydraulic straighteners | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAPUME | Dynamic track stabilizers | Machine hours | ||||||||||
| PU_MEKAKA_KALILI | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Universal track wrenches | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Rail cutting machines | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKAME | Electricity: consumption 1.91 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Rail drilling machines, power 1.15 kW | Machine hours | ||||||||||
| DXME-KADX-MERI_MEKARI | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||