AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-TO-KARI-KADX | Fast-acting dry cement mixtures | kg | ||||||||||
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEPU-KAME_KAKAKARI | Polyurethane foam sealant (assembly foam), universal, volume 1000 ml | Nr | ||||||||||
| KAPU-TO-KARI-MEPU_KAMEMEKA | Two-component polymer-cement composition from a dry mixture based on cement, mineral filler, reinforcing fiber, modifying additives (component A) and polymers in aqueous dispersion (component B) for protection and waterproofing of concrete, F300, W12, adhesive strength not less than 2 MPa | kg | ||||||||||
| MERI-RI-KALI-KASA_KAKAPUPU | Thermal insulation tubes made of foamed polyethylene, inner diameter 30 mm, thickness 9 mm | 100 m | ||||||||||
| MEPU-TO-KAME-KAME_KAKAKAME | Adhesive primer for treating dense, smooth, slightly absorbent and non-absorbent substrates | kg | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||