AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KASA-MERI | Precast reinforced concrete structures (shell piles) | m3 | ||||||||||
| KALI-RI-KALI-METO | Steel knife and joint structures | t | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKASAPU | BN-90/10 petroleum bitumen for construction | t | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | m3 | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | kg | ||||||||||
| KAME-LI-MEDX-KADX_KAKARIPU | Rubber-fabric pressure hose for water with a pressure of 1 MPa (10 kgf/cm2), inner diameter 32 mm | m | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 1200-3000 mm, thickness 9-12 mm | t | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 35-56 mm, shelf thickness 3-5 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length 2-6.5 m, width 100 mm and above, thickness 100 mm and above, grade III | m3 | ||||||||||
| RITO-TO-KATO-KARI_KAKARISA | Seamless hot-rolled steel pipes with chamfered edges, steel grades 10, 20, 35, outer diameter 45 mm, wall thickness 3.5 mm | m | ||||||||||
| RITO-TO-KATO-KARI_KAKAVOSA | Seamless hot-rolled steel pipes with chamfered edges, steel grades 10, 20, 35, outer diameter 114 mm, wall thickness 4.5 mm | m | ||||||||||
| DXME-KARI-KAME_KAKASA | Low-frequency electric vibratory pile drivers for driving pile casings, eccentric moment 124.4 kgm, centrifugal force 604 kN | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAME_KAKASA | Electricity: consumption 44.55 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKALI | Gantry cranes, lifting capacity 65 t, hook lifting height 24 m | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKALI | Electricity: consumption 21.12 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAPU | Mobile screw compressors with internal combustion engines, pressure up to 1 MPa (10 atm), capacity up to 10 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KAPURI | Multi-stage centrifugal pumps with electric drive, flow rate 60 m3/h, head 165 m | Machine hours | ||||||||||
| PU_MEKAKA_KARIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KAPURI | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||