AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUDX | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KARI_KAKAKARI | Argon gas, highest grade | m3 | ||||||||||
| KAME-TO-KATO-KALI_KAKAKAME | Acetic acid | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKARI | Tap water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-KADX_KAKAPUME | Gland packings, AP grade | kg | ||||||||||
| KAME-LI-KALI-RIPU_KAKAMEKA | Two-component developer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, development time 5-8 min, consumption 0.8 l/m2 | l | ||||||||||
| KAME-LI-KALI-RIPU_KAKARIKA | Two-component fixer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, fixing time 5-10 min, consumption 0.8 l/m2 | l | ||||||||||
| KAME-LI-MEME-KAPU_KAKASAME | SV-04X19H11M3 welding wire, diameter 2 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIPUNE | Welding electrodes for welding heat-resistant austenitic and high-strength structural steels EA-395, diameter 2-5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KATOMETO | Tungsten welding electrodes for welding high-alloy and refractory steels | kg | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAPUKA | Rubber plates 1F-I-MBS-M, thickness 1-20 mm | kg | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x400 mm, surface density from 105 to 130 g/m2 | m2 | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | t | ||||||||||
| MEME-ME-KATO-KASA_KAKANENE | Unedged softwood boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 30-50 mm, grade IV | m3 | ||||||||||
| MEPU-PU-KARI-KAPU_KAMENERI | Oil paint MA-011-0, MA-011-1, MA-011-1N, MA-011-2, MA-011-2N | t | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | kg | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | kg | ||||||||||
| RISA-ME-KAME-KAPU_KAKAMERI | Coniferous wood sleepers, untreated, for narrow-gauge railways, type II, length 1200 mm | Nr | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption 51.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KATO_KAKATO | Cantilever cranes, load capacity 5 t | Machine hours | ||||||||||
| PU_MEKAKA_KARIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KATO_KAKATO | Electricity: consumption 5.58 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electric bridge cranes, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electricity: consumption 46.7 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KATOME | Electric overhead cranes (crane beams), load capacity 3.2 t | Machine hours | ||||||||||
| DXME-KASA-KAPU_KATOME | Electricity: consumption 2.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 73 t | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 550 kW (559.3 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 15 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-MELI-KARI_KARIME | Gamma flaw detectors with a penetrable steel thickness of up to 80 mm | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAMEME | Automatic welding machines, welding current up to 1250 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAMEME | Electricity: consumption 19.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITORI | Three-phase welding inverters for argon arc welding, maximum welding current 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITORI | Electricity: consumption 3.52 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 200 m3/h, head 25 m, power 22 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption 7.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption 0.45 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 426 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||