Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAME_KAKAKARI | Technical nitrogen gas | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 4-5 mm | kg | ||||||||||
| KAME-LI-MEDX-KAPU_KAKATOME | Rubber gaskets (pressed technical plate) | kg | ||||||||||
| KAME-LI-RIKA-KAVO_KAKATOME | Coarse calico, width 1640 mm, surface density 125 g/m2 | 10 m | ||||||||||
| KAVO-ME-KARI-RISA_KAKARIME | Improved cast steel shot, fraction 0.3-3.2 mm | t | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | kg | ||||||||||
| MEPU-SA-KADX-METO_KAKAKAME | Turpentine | kg | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electric hoists, load capacity 5 t | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKASA | Electricity: consumption 0.42 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMETO | Machines for cleaning and priming pipes with a diameter of 600-800 mm | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAMETO | Electricity: consumption 15.18 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 15 t | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KARIME | Vacuum pumps 3.6 m3/min | Machine hours | ||||||||||
| DXME-MEDX-MERI_KARIME | Electricity: consumption 2.03 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | High-pressure painting units for painting structural surfaces, power 1 kW | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | Electricity: consumption 0.23 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMENE | Pipe bending machines complete with mandrel for cold bending of pipes with an outer diameter of 508-1020 mm | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMENE | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Turning and screw-cutting machines | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Electricity: consumption 2.52 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 426 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|