AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-PU-KAME-KAME | Steel foundation anchors | t | ||||||||||
| KAVO-PU-KATO-KAME | B-II steel reinforcing wire | t | ||||||||||
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEDX | Ready-mixed masonry mortar, cement, M400 | m3 | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | t | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAMERI | Light wire, diameter 1.1 mm | t | ||||||||||
| KAVO-TO-KALI-KAME_KAKANEKA | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x10 mm | t | ||||||||||
| MEME-ME-KATO-KAME_KAKANENE | Edged timber of coniferous species (spruce, pine), natural moisture content, length 2-6.5 m, width 100 mm and above, thickness 100 mm and above, grade II | m3 | ||||||||||
| DXME-KASA-KANE_KAKADX | Cranes on crawler tracks, load capacity 50 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKAPU | Hydraulic jacks, load capacity 200 t | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electric winches with a pulling force of 19.62 kN (2 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KAMEME | Concrete pumps, capacity 65 m3/h | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KARIRI | Medium-pressure diesel trailer pump stations, flow rate up to 320 m3/h, pressure up to 50 m | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||