Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Continue in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Tunneling with a diameter of over 6.01 to 9 m using the continuous face method for the construction of chambers for the installation of a block layer using scaffolding in areas where drilling and blasting operations are restricted in soils of the group, 3

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/