AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KAME-KADX_KAKATOKA | General-purpose asbestos cord, diameter 18-25 mm | t | ||||||||||
| KAME-ME-KARI-KAPU_KAKAMERI | General-purpose asbestos cardboard, grade KAON-1, thickness 4 and 6 mm | t | ||||||||||
| KAME-TO-KARI-KARI_KAKAKARI | Argon gas, highest grade | m3 | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | m3 | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | kg | ||||||||||
| KAME-TO-KATO-KALI_KAKAKAME | Acetic acid | kg | ||||||||||
| KAME-LI-KATO-KAME_KAKAKARI | Tap water | m3 | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIPU_KAKAMEKA | Two-component developer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, development time 5-8 min, consumption 0.8 l/m2 | l | ||||||||||
| KAME-LI-KALI-RIPU_KAKARIKA | Two-component fixer for processing radiographic film, solution temperature for manual/automated processing 22/28 °C, fixing time 5-10 min, consumption 0.8 l/m2 | l | ||||||||||
| KAME-LI-MEME-KAPU_KAKASARI | Uncoated welding wire SV-08G2S, diameter 2 mm | kg | ||||||||||
| KAME-LI-MEME-KAPU_KAKASASA | Welding wire SV-08XMFA, diameter 2 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIKANE | Welding electrodes for welding heat-resistant steels TML-3U, diameter 3 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIMETO | Welding electrodes for welding low-alloy and carbon steels TMU-21U, E50A, diameter 3-5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARITONE | Welding electrodes for welding alloyed high-strength and heat-resistant steels TS-39, diameter 2.5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KARIPUPU | Welding electrodes for welding alloyed high-strength and heat-resistant steels TsU-5, diameter 2.5 mm | kg | ||||||||||
| KAME-LI-MEME-KALI_KATOMETO | Tungsten welding electrodes for welding high-alloy and refractory steels | kg | ||||||||||
| DXME-KASA-KAPU_KAMERI | Electric overhead cranes, lifting capacity 100 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMERI | Electricity: consumption 75.9 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 16 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KARI_KARIME | Gamma flaw detectors with a penetrable steel thickness of up to 80 mm | Machine hours | ||||||||||
| DXME-MELI-KARI_KATORI | Ultrasonic flaw detectors, thickness of the product being inspected up to 6000 mm | Machine hours | ||||||||||
| DXME-MELI-KARI_KAVOME | Universal styloscopes | Machine hours | ||||||||||
| DXME-MELI-KARI_KAVOME | Electricity: consumption 0.24 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KATO_KAPUME | Units for heating metal barrels with a capacity of 200 l, power 3 kW | Machine hours | ||||||||||
| DXME-MELI-KATO_KAPUME | Electricity: consumption 0.99 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 200 m3/h, head 25 m, power 22 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption 7.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 426 mm | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||