AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TORI | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KAME-KADX_KAKATOKA | General-purpose asbestos cord, diameter 0.709-0.984 in | ton | ||||||||||
| KAME-ME-KARI-KAPU_KAKAMERI | General-purpose asbestos cardboard, grade KAON-1, thickness 4 and 0.236 in | ton | ||||||||||
| KAME-TO-KAME-KATO_KAKAKARI | Kerosene for technical purposes | ton | ||||||||||
| KAME-TO-KAME-KALI_KAKAKAME | Synthetic butyl alcohol | ton | ||||||||||
| KAME-TO-KAPU-KALI_KAKAKAME | Turbine oil | lb | ||||||||||
| KAME-LI-KARI-KASA_KAKAMEME | Electrical sheet laminate, grade 1, thickness 0.2-0.35 mm | lb | ||||||||||
| KAME-LI-KARI-KALI_KAKAMEME | Pressboard, grade A | lb | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KASA-KADX_KAKAMERI | Textolite sheet for crafting, thickness from 1 to 0.118 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MEPU-KALI_KAKALIRI | PVC sheet plastic, operating temperature from -15 °C to +70 °C, tensile strength 16.7 MPa | ton | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-MESA-MEKA_KAKASAPU | Metal staples for installation | lb | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | ton | ||||||||||
| KAVO-TO-KARI-KAME_KAKARIDX | Hot-rolled steel strips, steel grades St3sp, St3ps, thickness 3.5 mm, width 3.94-8.66 in | ton | ||||||||||
| KAVO-TO-KAPU-KARI_KAKADXSA | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 0.551-1.969 in | ton | ||||||||||
| KAVO-TO-KASA-KASA_KAKATOME | Roofing sheet steel, grade STK-1, thickness 0.5 mm | ton | ||||||||||
| KAVO-TO-KALI-KAME_KAKASARI | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 50x0.197 in | ton | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAPUSA | Hot-rolled steel angle bar with equal flanges, steel grades St3sp, St3ps, flange width 2.48-3.94 in, flange thickness 0.157-0.630 in | ton | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKARI | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 12U-24U, No. 12P-24P | ton | ||||||||||
| MEKA-RI-KARI-KAPU_KAKAKAVO | Hot-rolled copper sheets, grade M2, thickness 0.118 in | ton | ||||||||||
| MEKA-RI-KARI-MEKA_KAKAMETO | Round copper rods, grade M3, diameter 0.394-1.181 in | ton | ||||||||||
| MEKA-TO-KARI-KARI_KAKAMETO | Tin, grade O1PCH | lb | ||||||||||
| MEKA-TO-KARI-KASA_KAKAMERI | Lead in ingots C0, C1 | ton | ||||||||||
| MEME-ME-KARI-KAME_KAKATOME | Round hardwood timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | CY | ||||||||||
| MEME-ME-KATO-KASA_KAKALITO | Unedged softwood boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 0.787 in, grade III | CY | ||||||||||
| MEME-RI-MEME-KAPU_KAMEKAME | Plywood with outer layers of birch veneer, grade FSF, class I/II, sanded, thickness 0.157 in | CY | ||||||||||
| MEPU-PU-KATO-KARI_KAKAMEME | Bakelite varnish LBS-1, LBS-2 | ton | ||||||||||
| RISA-ME-KAME-KAPU_KAKATOME | Coniferous wood sleeper, untreated, for broad gauge railways, type I | EA | ||||||||||
| DXME-KASA-KARI_KAKASA | Gantry cranes, lifting capacity 35.27 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKASA | Electricity: consumption 36.3 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKAVO | Electric overhead cranes, lifting capacity 22.05 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKAVO | Electricity: consumption 26.73 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-110.23 ton | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electric winches with a pulling force of up to 12.26 kN (1.25 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electricity: consumption 0.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 750 HP (550 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 6.5 CY/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Electricity: consumption 12.21 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 261.6 CY/h, head 82.0 ft, power 30 HP (22 kW) | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption 7.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATORI | Metal planing machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATORI | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Turning and screw-cutting machines | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Electricity: consumption 2.52 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||