AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KASA-KASA | Broad gauge railway rails, type P65 | LF | ||||||||||
| RISA-ME-KANE-KATO | Railway track and signal signs | 100 EA | ||||||||||
| RISA-ME-KANE-MESA | Switch points | set | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KASA-ME-KARI-KATO_KAKAMERI | Reinforced concrete beams for turnouts | CY | ||||||||||
| RIKA-RI-KARI-KAME_KAKAMEDX | Insulating bushings, dimensions 65x50x0.709 in | 1000 EA | ||||||||||
| RISA-ME-KARI-KAME_KAKATOSA | Reinforced concrete sleeper, type Sh1, concrete volume 0.106 m3, steel consumption 7.25 kg | EA | ||||||||||
| RISA-ME-KATO-KAME_KAKAMEME | PK terminals | ton | ||||||||||
| RISA-ME-KATO-KAPU_KAKAMETO | Steel washers, type TsP-138, dimensions 65x1.57 in | 1000 EA | ||||||||||
| RISA-ME-KATO-KANE_KAKAMERI | Double-coil spring washers, hole diameter M25 | ton | ||||||||||
| RISA-ME-KAPU-KAME_KAKAKAME | Anchor bolts for railway track fastenings, diameter M22, length 6.89 in, with nut diameter M22 | ton | ||||||||||
| RISA-ME-KAPU-KARI_KAKAKAME | Terminal bolts for railway track fastenings, diameter M22, length 2.95 in, with nut diameter M22 | ton | ||||||||||
| RISA-ME-KASA-KARI_KAKAKANE | Separate fastening pads for railway tracks for reinforced concrete sleepers, type KB-65 | ton | ||||||||||
| RISA-ME-KANE-MEVO_KAMEKARI | Rubber pads for under-rail base, type TsP-318 | 1000 EA | ||||||||||
| RISA-ME-KANE-MEDX_KAKASAME | Rubber rail base pad for underlayment, type TsP-328 | EA | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 1200 HP (880 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KAVO_KAKAME | Trains for transporting switch block components | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Double-girder gantry cranes for use at link assembly bases, 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Electricity: consumption 11.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKATO | Laying cranes for 82.0 ft rail sections on reinforced concrete sleepers | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Universal track wrenches | Machine hours | ||||||||||
| DXME-KADX-MERI_KATOME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||