AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAVO-MEPU | Precast reinforced concrete structures | CY | ||||||||||
| KAVO-PU-KAME-KARI | Embedded and surface-mounted parts | ton | ||||||||||
| ME_MEKAKA_PUPU | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | lb | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | ton | ||||||||||
| KAPU-ME-KARI-KASA_KAMESARI | Heavy concrete mixes (BST) on gravel aggregate, class B25, F(1)200, W8 | CY | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | ton | ||||||||||
| KAVO-PU-KATO-KAME_KAKAMERI | Low-carbon steel reinforcing wire, class Vp-1, diameter 0.157-0.197 in | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANENE | Edged timber of coniferous species (spruce, pine), natural moisture content, length 2-6.5 m, width 3.94 in and above, thickness 3.94 in and above, grade II | CY | ||||||||||
| MEME-ME-KATO-KASA_KAKANEPU | Unedged softwood board, natural moisture content, length 2-6.5 m, width 100-250, thickness 1.18-1.97 in, grade II | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIPU | Edged boards of coniferous species, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.18-1.57 in, grade II | CY | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARISA | Mobile mortar mixers, drum capacity 250 l | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARISA | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEKA_KARIME | Pneumatic shotcrete machines with electric drive when operating from stationary compressor stations, capacity up to 9.2 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEKA_KARIME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 261.6 CY/h, head 82.0 ft, power 30 HP (22 kW) | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption 7.26 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||