AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KASA-KASA | Broad gauge railway rails, type P65 | LF | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RISA-ME-KATO-KAME_KAKAKAME | Spring rod terminal CP-TONEDX.MEKARI | EA | ||||||||||
| RISA-ME-KATO-KANE_KAKATOTO | Single-coil spring washers, type 1, hole diameter M27 | ton | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKATO | Track bolts for fastening rails, diameter M27, length 6.30 in, 7.09 in, with nut diameter M27 | ton | ||||||||||
| RISA-ME-KASA-KAME_KAKAKAME | Double-headed rail plate, type 1P65 | EA | ||||||||||
| RISA-ME-KANE-MEVO_KAMEKASA | Rubber gaskets for rail base, type TsP-538, TsP-638 | 1000 EA | ||||||||||
| RISA-ME-KANE-MEDX_KAMEKASA | Rubber rail pad for underlayment, type CP-TONEDX.VOMEKA | EA | ||||||||||
| RISA-TO-KAVO-KAME_PUDXSANE | Reinforced concrete sleeper Sh3-D | EA | ||||||||||
| RISA-TO-MEPU-KAME_MEVOLIVO | Flat round washer | EA | ||||||||||
| RISA-TO-MEPU-KAME_MEDXRIPU | Hexagon head track screws, type TsP 54, diameter M24, length 7.68 in | ton | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOLI | Wide gauge platforms with roller conveyor | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 1200 HP (880 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Double-girder gantry cranes for use at link assembly bases, 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_KAKAME | Electricity: consumption 11.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKAPU | Assembly stands (workshop equipment) | Machine hours | ||||||||||
| DXME-KADX-KADX_MEKAPU | Electricity: consumption 6.07 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||