AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KATO | Mastic | ton | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| KAPU-TO-KAME-KADX | Ready-mixed heavy cement mortar | CY | ||||||||||
| KASA-RI-KARI-KAME | Concrete blocks | CY | ||||||||||
| KANE-ME-KAME-KASA | Single ceramic brick, size 250x120x2.56 in | 1000 EA | ||||||||||
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAKAMEPU | Hot bitumen roofing mastic MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100 | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-KASA_KAKAPURI | PVC insulating tape for electrical installation and repair work, black, width 0.748 in, thickness 0.18 mm | LF | ||||||||||
| KAME-LI-KALI-RIDX_KAKATOME | Cable | ton | ||||||||||
| KAME-LI-KALI-RIDX_KAMEKAME | Linen thread | lb | ||||||||||
| KAME-LI-MESA-KANE_KAKARIRI | Steel roofing nails, diameter 0.079-0.118 in, length 0.787-1.575 in | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KARI-RI-KAME-KARI_MEKAPURI | Gravel M 400-1000, fraction 5(3)-0.394 in | CY | ||||||||||
| KARI-RI-KASA-KAPU_RIKASAVO | Crushed stone from dense rock for construction work M 800, fraction 0.394-0.787 in | CY | ||||||||||
| KATO-ME-KAME-KAME_KAKAKARI | G-3 construction gypsum | ton | ||||||||||
| KATO-RI-KARI-KAVO_KAKAKAME | Expanding gypsum-clay cement | ton | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | CY | ||||||||||
| KALI-RI-KALI-METO_KATOMEME | Steel screw ties for containers, pin diameter 1.26 in, length 11.02 in | 100 EA | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | CY | ||||||||||
| MEME-ME-KATO-KAME_KAKANEPU | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in, grade IV | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKAVOTO | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.787-0.866 in, grade III | CY | ||||||||||
| MERI-ME-KARI-KATO_KAKASATO | Rolled bitumen-polymer roofing and waterproofing material, weldable, polyester base, flexibility not lower than -15 °C, strength not less than 360 N, heat resistance not less than 120 °C | SF | ||||||||||
| MEPU-RI-KAPU-KAME_KAKAKAME | Coal tar for road construction | ton | ||||||||||
| DXME-KAME-KAME_KATOPU | Bulldozers, power 80 HP (59 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity 0.5 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KADX_KAMEME | Equipment for hydraulic testing of pipelines, low pressure 0.1 MPa (1 kgf/cm2), high pressure 10 MPa (100 kgf/cm2) | Machine hours | ||||||||||
| DXME-MEKA-KADX_KAMEME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||