AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-TO-KAME-KARI | Construction sand | CY | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| KAPU-TO-KAME-KADX | Ready-mixed heavy cement mortar | CY | ||||||||||
| KASA-RI-KARI-KAME | Concrete blocks | CY | ||||||||||
| MERI-ME-KARI-KANE | Roll roofing materials for the top layer | SF | ||||||||||
| ME_MEKAKA_RIVO | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-KAPU_KAKAMERI | General-purpose asbestos cardboard, grade KAON-1, thickness 4 and 0.236 in | ton | ||||||||||
| KAME-RI-KAME-KARI_KAKASAPU | BN-90/10 petroleum bitumen for construction | ton | ||||||||||
| KAME-RI-KATO-KATO_KAKAMEPU | Hot bitumen roofing mastic MBK-G-55, MBK-G-65, MBK-G-75, MBK-G-85, MBK-G-100 | ton | ||||||||||
| KAME-TO-KAME-KATO_KAKAKARI | Kerosene for technical purposes | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-KAVO_KAKAKATO | Hard laundry soap 72% | EA | ||||||||||
| KAME-LI-MESA-KANE_KAKARIME | Galvanized steel roofing nails, diameter 0.079-0.118 in, length 0.787-1.575 in | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| KAME-VO-KARI-KANE_MEKARIKA | Float glass sheet M4, colorless, nominal thickness 0.157 in | SF | ||||||||||
| KARI-RI-KAME-KATO_KAKAMEPU | Expanded clay gravel M 400, fraction 0.394-0.787 in | CY | ||||||||||
| KARI-RI-KASA-KAPU_RIMEKARI | Crushed rock from dense rock for construction work M 400, fraction 40-80(70) mm | CY | ||||||||||
| KAVO-TO-KASA-KASA_KAKATOME | Roofing sheet steel, grade STK-1, thickness 0.5 mm | ton | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKAVOTO | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.787-0.866 in, grade III | CY | ||||||||||
| MEME-RI-KAVO-KAME_KAKAKAVO | Wet-process wood fiberboard, soft M-2, thickness 0.472 in | 1000 SF | ||||||||||
| MEPU-RI-KAPU-KAME_KAKAKAME | Coal tar for road construction | ton | ||||||||||
| MEPU-SA-KARI-KARI_KAMEKARI | Window putty based on drying oil | ton | ||||||||||
| MEPU-SA-KASA-KARI_KAKAKAME | Natural drying oil | lb | ||||||||||
| DXME-KAME-KAME_KATOPU | Bulldozers, power 80 HP (59 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity 0.5 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARITO | Pneumatic rammers powered by mobile compressor units | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||