Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Auxiliary work during the development and laying of soil using hydromonitor-pump-dredging installations using the layer-by-layer soil support method and the ridge filling method with one-sided filling, installation productivity (by soil):; 261.6 CY/h

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/