AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KARI-RI-KAPU-KAME_KAKAKARI | Gravel ballast | CY | ||||||||||
| KASA-RI-KARI-RIPU_KAKARIME | Track cubes, concrete B15, volume 0.006 m3 | CY | ||||||||||
| DXME-KANE-KARI_KAKATO | Inclined mobile belt conveyors, height 49.2 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KARI_KAKATO | Electricity: consumption 4.95 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKATO | Tipping wagons, capacity 0.8 m3 | Machine hours | ||||||||||
| DXME-KADX-MEKA_KASAME | Electric tamping machines | Machine hours | ||||||||||
| DXME-KADX-MERI_KARIME | Track jacks | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||