AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-PU-KAME-KANE_KAMENERI | Pin drill bit for hydraulic perforators and rotary percussion drilling machines, internal thread R32, diameter 1.69 in | EA | ||||||||||
| KAME-PU-KARI-KAPU_MEMETOPU | Steel hexagonal drill rod, hexagon size 1.26 in, shank with R38 thread, external thread R32, length 145.67 in | EA | ||||||||||
| KAME-PU-KATO-KANE_KARIKARI | Single-chamber ampoule made of non-woven material for anchor fastening, filling of boreholes during blasting operations, filled with dry mineral mixture, diameter 1.50 in, length 13.78 in | EA | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KADX-KAME_KAKAMEPU | Ammonite in PZhV-20 cartridges, diameter 1.42-1.46 in | ton | ||||||||||
| KAME-LI-KADX-KARI_KAKATOME | ED-KZ waterproof short-delay electric detonators | 1000 EA | ||||||||||
| KAME-LI-KADX-KATO_KAKARIPU | Wire with copper cores VP 2x0.028 in | 1000 LF | ||||||||||
| KAME-LI-KADX-KAPU_KAKASATO | Polyethylene hydroampoules for plugging holes during blasting operations, diameter 1.50 in, length 17.72 in | 1000 EA | ||||||||||
| DXME-KATO-KANE_KAMEPU | Loading and delivery machines with internal combustion engines on pneumatic wheels in explosion-proof design, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KATO-MEDX_METOTO | Double-boom drilling rigs on pneumatic wheels in explosion-proof design, working area up to 592 SF, drilling diameter up to 3.54 in, drilling depth up to 196.85 in | Machine hours | ||||||||||
| DXME-KATO-MEDX_METOTO | Electricity: consumption 42.9 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption 2.97 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_MERIME | Multifunctional auxiliary machines with scissor hydraulic platform, platform load capacity up to 3306.9 lb | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity 2.5 m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||