AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KATO-KATO | Foam reagent | lb | ||||||||||
| KAME-LI-MESA-KAME | Anchors | ton | ||||||||||
| KAME-LI-MESA-KATO | Bolts with nuts and washers | ton | ||||||||||
| KASA-ME-KARI-KARI | Reinforced concrete blocks and tubing | CY | ||||||||||
| KALI-RI-KALI-MERI | Structural elements of buildings and structures | ton | ||||||||||
| KAVO-PU-KAME-KARI | Rebar blanks | ton | ||||||||||
| MEME-ME-KATO-KANE | Edged boards | CY | ||||||||||
| MEME-RI-KAPU-KANE | Wooden wedges | CY | ||||||||||
| RINE-ME-KAME-KARI | Bolt kit for tunnels | set | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-PU-KAME-KANE_KAMENERI | Pin drill bit for hydraulic perforators and rotary percussion drilling machines, internal thread R32, diameter 1.69 in | EA | ||||||||||
| KAME-PU-KATO-KAME_KAKAMEME | Bentonite powder (clay powder) for preparing drilling fluids, fluid yield 12.0-15.0 m3/t | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KAME_MEPUDXME | Galvanized steel expansion anchors for high loads with hexagonal head, diameter M24, length 9.25 in | 10 EA | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-MELI-KALI_KAKASAME | Straight profile grinding wheel, grinding material grade 25A, dimensions 100x20x0.787 in | EA | ||||||||||
| KAME-LI-MELI-KADX_KAKANEDX | Diamond ring drill bit, diameter 2.36 in | EA | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIVO | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 20B-60B | ton | ||||||||||
| KAVO-TO-KAPU-KAME_MEKARIPU | Carbon steel wire rod, steel grades St3sp, St3ps, diameter 0.197-0.354 in | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANENE | Edged timber of coniferous species (spruce, pine), natural moisture content, length 2-6.5 m, width 3.94 in and above, thickness 3.94 in and above, grade II | CY | ||||||||||
| RINE-ME-KAME-KATO_KAKAMEME | Steel pressure plates, length 118.11 in, width 1.22 in, thickness 1.5 mm | ton | ||||||||||
| DXME-KATO-MEDX_KADXRI | Hand-held pneumatic wrenches for use with mobile compressor units | Machine hours | ||||||||||
| DXME-KAPU-KAME_KALIME | Drilling rigs for percussion drilling, drilling depth up to 82.0 ft, hole diameter 1.89-2.36 in when operating from mobile compressor units | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-110.23 ton | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMEDX | Pumps, capacity 392.4 CY/h, head 98.4 ft, power 60 HP (45 kW) | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMEDX | Electricity: consumption 14.85 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIKA_KAMETO | Electric diamond drilling rigs for reinforced concrete, drilling diameter up to 9.84 in | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIKA_KAMETO | Electricity: consumption 0.87 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_TOKAME | Supports for portable pneumatic perforators | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||