Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Cable protection in the space between tracks, under tracks, and in the subgrade, reinforced concrete slabs (up to 5 cables)

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/