| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KANE-KALI_KAKAKARI | Plastic mounting tapes for wire bundling, fastened with plastic buttons, width 0.394 in | 10 LF | ||||||||||
| KAME-LI-MESA-MEPU_KAMENESA | Self-tapping steel screws with a semi-circular head and a straight slot, pointed, diameter 0.157 in, length 1.57 in | ton | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMEME | Tin-lead solder without antimony, grade POS30 | lb | ||||||||||
| MEPU-PU-KATO-KATO_KAKAKARI | BT-123 bitumen varnish | ton | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-110.23 ton | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electric winches with a pulling force of up to 49.05 kN (5.51 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electricity: consumption 0.53 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPURI | Hydraulic lifts, lifting height 32.8 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPURI | Electricity: consumption 1.49 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MESA-KATO_KAMEPU | Pneumatic-tired tractors, power 80 HP (59 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||