AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKAPUME | Litol-24 grease | lb | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKARIRI | Galvanized steel bolts with hexagonal head, complete with hexagonal nut and flat round washer, thread diameter M16 (M18), bolt length 0.984-7.874 in | ton | ||||||||||
| KAME-LI-MESA-KATO_KAKATOME | Galvanized steel bolts with hexagonal heads and galvanized hexagonal nuts, bolt and nut thread diameter M6, bolt length 0.472-2.362 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKATOTO | Galvanized steel bolts with hexagonal heads and galvanized hexagonal nuts, bolt and nut thread diameter M10, bolt length 0.630-6.299 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKATOPU | Galvanized steel bolts with hexagonal heads and galvanized hexagonal nuts, bolt and nut thread diameter M12, bolt length 0.787-6.299 in | lb | ||||||||||
| KAME-LI-MELI-KALI_KAKASATO | Straight profile grinding wheel, dimensions 180x10x0.866 in | EA | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x15.75 in, surface density from 105 to 0.384 oz/SF | SF | ||||||||||
| KAVO-PU-KAME-KARI_KAKAMETO | Embedded and overlay parts manufactured using welding, bending, drilling (punching) of holes (if one of these operations or the entire list is present in any combination), supplied separately | ton | ||||||||||
| MEPU-SA-KAME-KANE_KAKAMEPU | Single-component polyurethane structural sealant, water-resistant, resistant to UV radiation and aggressive environments, for inter-panel and inter-block joints, prefabricated structure connection nodes, roof joints, and building structure joints | lb | ||||||||||
| DXME-KASA-KAME_KAMESA | Tower cranes, load capacity 50 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMESA | Electricity: consumption 13.48 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKAME | Circular action cranes, load capacity 320-176.37 ton, span 141.1 ft | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKAME | Electricity: consumption 66 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKAME | Manual lever hoists | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||