AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MESA-KANE_KAMERIRI | Steel construction nails, diameter 1.8 mm, length 1.97-2.36 in | ton | ||||||||||
| MEME-ME-KARI-KADX_KAKAKATO | Mine props made of coniferous wood (pine, fir), length 0.9-4 m, diameter 7-24 cm | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| DXME-KATO-KANE_KAMETO | Loading and delivery machines with internal combustion engine on pneumatic wheels, load capacity up to 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption 2.97 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_MERIME | Multifunctional auxiliary machines with scissor hydraulic platform, platform load capacity up to 3306.9 lb | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KAVO-KASA_KAPUSA | Concrete placing units for mechanized placing of concrete mix behind formwork in mine workings with a cross-section of at least 8.4 m2, capacity up to 6.5 CY/h, hopper volume 0.5 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KATOSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KAPUSA | Electricity: consumption 3.63 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity 2.5 m3 | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKALI | Mine concrete mixers, drum volume up to 3.9 CY | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||