AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy structural concrete mixes | CY | ||||||||||
| ME_MEKAKA_RIDX | Average work load 2.9 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KALI-MERI_KAKAMEME | Waterproofing wrapping film, thickness 0.55 mm | SF | ||||||||||
| KAME-LI-MERI-KASA_KAKASATO | Non-woven polyester geotextile, needle-punched, surface density 0.590 oz/SF | SF | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | ton | ||||||||||
| DXME-KALI-KARI_KAMEME | Concrete pumps, capacity 85.0 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KATO_KAMEKA | Mobile forced-action concrete mixers, hopper capacity 250 l | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KATO_KAMEKA | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||