Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Concreting of monolithic reinforced concrete structures of the above-ground part of buildings using the "bucket crane" method, for buildings up to 98.4 ft high, columns with the smallest side of the cross section over 11.81 in to 19.69 in

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/