Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Concreting of monolithic reinforced concrete structures of underground and basement parts of buildings using the "crane-bucket" method, columns with the smallest side of the cross-section exceeding 300 to 19.69 in

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/