AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MENE-KAPU | Formwork inventory (depreciation) | set | ||||||||||
| KAPU-ME-KARI-KAPU | Heavy concrete mixes for transport construction | CY | ||||||||||
| ME_MEKAKA_PUSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KAPU-KAVO_KAKAMERI | Anthracene oil | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-MEPU_KAKAPUME | Polyethylene-laminated fabric-based tape with adhesive layer on one side for sealing and insulation, gray, width 1.89 in, thickness 0.18 mm | 10 LF | ||||||||||
| KAME-LI-KALI-MERI_KAKAMEME | Waterproofing wrapping film, thickness 0.55 mm | SF | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MERI-KASA_MEKAMEVO | Non-woven polypropylene geotextile, needle-punched, thermally bonded, surface density 1.623 oz/SF | SF | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAPU-TO-KAME-MERI_KAKAKATO | Masonry mortar, cement-lime, M50 | CY | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | ton | ||||||||||
| KALI-TO-KARI-MEME_KAMEKAME | Steel tie rods, fastening diameter 15/0.669 in, length 39.37 in, with two cast iron tie nuts with an outer diameter of 3.54 in | ton | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| MEPU-SA-KAME-MEME_KAPUKAME | Non-hardening sealant made of synthetic rubbers, fillers, and plasticizers for sealing joints in the exterior walls of buildings and structures | ton | ||||||||||
| RITO-TO-KANE-KASA_KAKAKATO | Non-galvanized welded steel pipes for water and gas supply with thread, ordinary, nominal diameter 0.984 in, wall thickness 3.2 mm | LF | ||||||||||
| RIPU-TO-KATO-METO_KAKAPUPU | Polyethylene pressure pipes, except for PE100 gas pipes, for water transportation, standard dimensional ratio SDR17, nominal outer diameter 2.95 in, wall thickness 4.5 mm | LF | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KAMEME | Concrete pumps, capacity 85.0 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKATO | Concrete mixer trucks, drum capacity 7.8 CY | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||