AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MENE-KAPU | Sliding formwork (cushioning) | set | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| KAPU-TO-KAME-KADX | Ready-made finishing mortar | CY | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | ton | ||||||||||
| MEME-ME-KATO-KANE | Boards | SF | ||||||||||
| ME_MEKAKA_PUME | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KAKASAPU | Welding electrodes for welding low-alloy and carbon steels ANO-6, E42, diameter 0.236 in | ton | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | ton | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAKAPU | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 7.09-7.87 in, shelf thickness 0.433-1.181 in | ton | ||||||||||
| KAVO-PU-KAME-KASA_KAKAKAME | Jack rods | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANESA | Edged softwood timber (spruce, pine), natural moisture content, length 2-6.5 m, width 3.94 in and above, thickness 3.94 in and above, grade I | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| DXME-KASA-KAME_KARIVO | Tower cranes, lifting capacity 11.02 ton, lifting height up to 360.9 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KARIVO | Electricity: consumption 9.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KASAKA | Construction freight and passenger lifts, lifting capacity 110.23 ton, lifting height 344.5 ft | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||