AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MESA-KARI | High-strength bolts | ton | ||||||||||
| KALI-TO-KARI-KATO | Steel bridge spans | ton | ||||||||||
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KASA-RITO_KAMERIDX | Technical sodium fluoride, grade A, type I | ton | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KAPU_KAKASARI | Uncoated welding wire SV-08G2S, diameter 0.079 in | lb | ||||||||||
| KAME-LI-MEME-KAPU_KAKALIRI | Uncoated welding wire SV-08G2S, diameter 0.157 in | ton | ||||||||||
| KAME-LI-MEME-KANE_KAKAKAPU | Flux AN-348-A | lb | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MELI-KASA_KAKARIME | Carborundum | lb | ||||||||||
| KAME-VO-KARI-KANE_MEKAMEKA | Float glass sheet M1, colorless, nominal thickness 0.157 in | SF | ||||||||||
| KARI-TO-KAME-KALI_KAKAKANE | Quartz sand, fraction 0-0.63 mm | CY | ||||||||||
| KAVO-TO-KALI-KAME_KAKANEKA | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 100x0.394 in | ton | ||||||||||
| MEKA-RI-KARI-KAPU_KAKARIME | Hot-rolled copper sheets, grade M2, thickness 0.433-0.984 in | ton | ||||||||||
| MERI-RI-KATO-MEME_KAKAMERI | Glass insulation fabric, density 0.678 oz/SF, thickness 0.2 mm | SF | ||||||||||
| MEPU-ME-KASA-KAPU_KAMEKANE | Two-component epoxy-based adhesive, components A and B | ton | ||||||||||
| MEPU-PU-KARI-KAPU_KARIRITO | MA-22 oil paint, zinc white | ton | ||||||||||
| DXME-KASA-KARI_KAKALI | Gantry cranes, lifting capacity 71.65 ton, hook lifting height 78.7 ft | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKALI | Electricity: consumption 21.12 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMENE | Truck-mounted cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KATO_KARIME | Mobile diesel fuel heating furnaces, tank capacity 0.5 m3 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAMEME | Automatic welding machines, welding current up to 1250 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAMEME | Electricity: consumption 19.31 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KATO_SAKARI | Sandblasting machines operating from mobile compressor units, volume up to 19 l, air consumption 270-700 l/min | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATODX | Electrohydraulic shears for cutting reinforcement bars, power 1.2 kW | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATODX | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||