Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Continue in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Construction of a closed underground passage using the HDD method with step-by-step expansion of the borehole for steel pipes in soils of groups I-III using rigs with a pulling force of 100 tf (1000 kN), for pipes Du=39.37 in up to 1640.4 ft long

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/