| KARI-TO-KAME-KARI | Natural sand for construction work | CY | ||||||||||
| KAPU-ME-KARI-KATO | Concrete mixtures (low-cement) rolled heavy concrete for road and airfield pavements | CY | ||||||||||
| ME_MEKAKA_MENE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KATO_KAKAKARI | Kerosene for technical purposes | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 37.40 in, surface density 0.560 oz/SF | 10 LF | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in, grade III | CY | ||||||||||
| MERI-ME-KARI-KANE_KAKAMERI | RKK-350 roofing felt | SF | ||||||||||
| DXME-KAME-KARI_KAKAPU | Medium-duty motor graders, power 135 HP (99 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KARI_KAKAME | Auto-asphalt mixers, tank capacity 3500 l | Machine hours | ||||||||||
| PU_MEKAKA_KAPUSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KATO_KAMETO | Self-propelled smooth vibratory rollers, weight 9.92 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KATO_KAMENE | Self-propelled smooth vibratory rollers, weight 8.82 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KATO_KARIDX | Self-propelled pneumatic wheeled static rollers, weight 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 7.8 CY | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||