AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MENE-KAPU | Metal formwork (depreciation) | set | ||||||||||
| KAPU-ME-KARI-KARI | Heavy concrete mixes for hydraulic structures | CY | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | ton | ||||||||||
| ME_MEKAKA_TONE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_MEKARIPU | Lubricant (liquid) for formwork lubrication | lb | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 37.40 in, surface density 0.560 oz/SF | 10 LF | ||||||||||
| KAVO-TO-KATO-KAPU_KAKASAKA | Black wire, diameter 0.118 in | ton | ||||||||||
| KAVO-PU-KAME-KARI_KAKAMETO | Embedded and overlay parts manufactured using welding, bending, drilling (punching) of holes (if one of these operations or the entire list is present in any combination), supplied separately | ton | ||||||||||
| MEME-ME-KATO-KANE_KAKALIPU | Edged boards of coniferous species, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.18-1.57 in, grade II | CY | ||||||||||
| DXME-KASA-KAVO_KAKALI | Pneumatic wheeled cranes, lifting capacity 33.07 ton | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKADX | Diesel tugs operating in open waters, power 400 HP (294 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKADX | Floating cranes for working in open waters, self-propelled, 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|