AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KATO | Heavy concrete mixes for road and airfield pavements | CY | ||||||||||
| ME_MEKAKA_RIDX | Average work load 2.9 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MELI-KANE_KAKAMESA | Diamond cutting segmented circle, diameter 39.37 in, segment 4.4x10x1.57 in | EA | ||||||||||
| KAME-LI-MELI-KADX_KAKANERI | Diamond ring drill bit, diameter 0.787 in | EA | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMEPU | Ready-mixed masonry mortar, cement, M100 | CY | ||||||||||
| MEPU-RI-KAME-KANE_KAKAMERI | Paraffin emulsion film-forming coating for road works, dry matter content 15-35%, pH 7-9, color white, yellow | ton | ||||||||||
| MEPU-RI-KASA-KAME_KAMEKAVO | Penetrating compound for strengthening and dedusting concrete surfaces | lb | ||||||||||
| DXME-KASA-METO_KAKAME | Flatbed trucks, load capacity up to 6 tons, with crane-manipulator, load capacity 4 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to 9.81 kN (1.10 ton) | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIPU | Mobile mortar mixers, drum capacity 65 l | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KASA_KARIME | Concrete pavers with sliding forms, power 92 HP (70 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KANE_KAMEME | Self-propelled joint cutters for hardened concrete, maximum cutting depth 18.90 in, power 84 HP (62 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 7.8 CY | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKATO | Concrete mixer trucks, drum capacity 7.8 CY | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAME | Dump trucks, load capacity up to 7.72 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKARI | Mobile screw compressors with internal combustion engines, pressure up to 1.3 MPa (13 atm), capacity up to 15.7 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | High-pressure painting units for painting structural surfaces, power 1 HP (1 kW) | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | Electricity: consumption 0.23 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKARI | Pneumatic jackhammers powered by mobile compressors | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUSA | Batch mixers with Z-shaped blades for mixing rubber adhesive | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUSA | Electricity: consumption 2.72 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||