AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KATO-KAME | Bentonite powders | ton | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| KAME-TO-KASA-RITO_KAMELIME | Calcined soda (sodium carbonate) technical grade | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| DXME-KARI-KASA_SAKAKA | Wide-grip crawler excavators, bucket capacity up to 1.3 CY | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KASALI | Single-bucket universal front pneumatic wheel loaders, nominal capacity of the main bucket 1.5 m3, load capacity 3.31 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Mortar pumps, capacity 7.8 CY/h | Machine hours | ||||||||||
| DXME-KALI-KALI_KAMETO | Electricity: consumption 1.24 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEME_KAKARI | Equipment for preparing and supplying solutions from dry mixtures, capacity up to 3.9 CY/min | Machine hours | ||||||||||
| DXME-KALI-MEME_KAKARI | Electricity: consumption 1.24 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KATO_KAKAME | Stationary compressors, capacity 19.6 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KATO_KAKAME | Electricity: consumption 36.3 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMERI | Mud pumps, capacity up to 19.6 CY/h, pressure up to 164.0 ft | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMERI | Electricity: consumption 1.32 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||