AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PURI | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAKANEPU | Bitumen-rubber insulation mastic MBR-75 | ton | ||||||||||
| KAME-TO-KAME-KAME_KAKAKARI | AI-98, AI-95 automotive gasoline | ton | ||||||||||
| KAME-LI-KANE-KASA_KAKAPUME | Rubberized cotton insulating tape for electrical installation and repair work, black, width 0.787 in, thickness 0.35 mm | LF | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMERI | Tin-lead solder without antimony, grade POS40 | lb | ||||||||||
| RIRI-RI-KARI-MEPU_KAKAMERI | Galvanized steel wire for overhead communication lines, ordinary, normal precision, classes 1, 2, diameter 2.0 mm | ton | ||||||||||
| RISA-RI-KAME-KAME_KAKAMENE | BM polystyrene marking tags, dimensions 50x0.984 in | 100 EA | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||