AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KARI-KALI_KAKAMEME | Pressboard, grade A | lb | ||||||||||
| KAME-LI-KANE-MERI_KAKAKAPU | Tapes made of dense cotton twill fabric, width 1.57 in | 100 LF | ||||||||||
| KAME-LI-MESA-KAPU_KAKAKAME | Brass screws with a semi-circular head and a straight slot, thread diameter M3, length 0.472 in | lb | ||||||||||
| KAVO-ME-KARI-KAPU_KAKAKAME | White electrolytic tinplate, thickness 0.22-0.25 mm | lb | ||||||||||
| KAVO-TO-KAVO-KARI_KAKASAVO | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 1.38-2.20 in, shelf thickness 0.118-0.197 in | ton | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMERI | Tin-lead solder without antimony, grade POS40 | lb | ||||||||||
| MEPU-PU-KARI-KAPU_KARIRIME | MA-15 oil paint, zinc white | ton | ||||||||||
| MEPU-SA-KASA-KARI_KAKAKAME | Natural drying oil | lb | ||||||||||
| RIKA-RI-MEKA-KATO_KAKARIKA | Copper cable lugs P 2.5-4 | 100 EA | ||||||||||
| RIKA-SA-KATO-KATO_KAKAKASA | Electrical aluminum busbar, grade AD0, width 1.18 in, thickness 0.157 in | lb | ||||||||||
| RIME-RI-KATO-KARI_MEKALIKA | MGSHV installation wire 1x0.2-1000 | 1000 LF | ||||||||||
| RIME-RI-KATO-KADX_KAMEKAME | Power cable APRN 1x35-660 | 1000 LF | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||