AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MERI-RI-KASA-KANE | Expanded polystyrene thermal insulation boards | CY | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KARI-RI-KASA-KAPU_KAKANEME | Crushed rock from dense rock formations for railway ballast, fraction from 25 to 2.36 in | CY | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity 6.3-25 t | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_SAMELI | Two-section broad gauge mainline diesel locomotives, power 7200 HP (5300 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAVOSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KALI_KARIME | Ballast graders | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KALI_SAKATO | Crushed stone cleaning machines, capacity 1200-2092.7 CY/h, non-self-propelled | Machine hours | ||||||||||
| PU_MEKAKA_KALINE | Personnel: 7 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAKANE | Track alignment, tamping, and straightening machines with a capacity of up to 2,000 sleepers/hour | Machine hours | ||||||||||
| PU_MEKAKA_KALILI | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEKA_KAPUME | Dynamic track stabilizers | Machine hours | ||||||||||
| PU_MEKAKA_KALILI | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KADX-MEPU_KAPUME | Traction and power modules for non-self-propelled machines | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MEPU_MEMERI | Compositions for waste collectors, capacity up to 994.0 CY | Machine hours | ||||||||||
| PU_MEKAKA_KASATO | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||