Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Build a full estimate in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Development of calottes up to 23.0 ft wide with temporary wooden supports, beams (longarines) with monolithic concrete lining of the tunnel without dismantling the longarines in, soils of group 1-2

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/