AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KAME-KANE | Three-pronged pin crown | EA | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-PU-KATO-KAPU_KAKAMEME | Hexagonal hollow drill steel 55S2, outer size 0.866 in, inner diameter 6.5 mm | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KANE-KATO_KAKARITO | Polyethylene tapes with adhesive layer, transparent, width 0.787 in, thickness 0.08 mm | lb | ||||||||||
| KAME-LI-KADX-KAME_KAKAKAME | Ammonite 6ZhV in cartridge form, diameter 1.26 in | ton | ||||||||||
| KAME-LI-KADX-KARI_KAKATORI | ZD-8-Zh instantaneous electric detonators | 1000 EA | ||||||||||
| KAME-LI-KADX-KATO_KAKAKAME | APRN wire for blasting operations, VP brand | 1000 LF | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKAMERI | Steel bolts with hexagonal heads, complete with hexagonal nuts and flat round washers, thread diameter M10, bolt length 0.630-6.299 in | ton | ||||||||||
| KAVO-TO-KAME-KARI_KAMEKAPU | I-beams with parallel shelf edges, steel grades 09G2S, 12G2S, No. 20B-60B | ton | ||||||||||
| KAVO-TO-KAME-KARI_KAMEMEKA | I-beams with parallel flanges, steel grades C345-C440, No. 10B-18B | ton | ||||||||||
| KAVO-TO-KAVO-KARI_MEMEKARI | Hot-rolled steel angle bar with equal flanges, steel grades 09G2S, 12G2S, flange width 3.94-4.92 in, flange thickness 0.236-0.630 in | ton | ||||||||||
| MEME-ME-KATO-KASA_KAKADXSA | Unedged hardwood board (lime), natural moisture content, length 2-6.5 m, all widths, thickness 1.77 in and above, grade II | CY | ||||||||||
| MEPU-PU-KATO-KAPU_KAKAKAME | Coal tar varnish, grade A | ton | ||||||||||
| DXME-KATO-KANE_KAPUKA | Electric bucket loading machines, capacity 1.25 m3/min | Machine hours | ||||||||||
| DXME-KATO-KANE_KAPUKA | Electricity: consumption 7.1 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KATO-KAVO_KAKATO | Portable column drills for drilling holes and wells when working from stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electric winches with a pulling force of 19.62 kN (2.20 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to 31.39 kN (3.2 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKARI | Non-tipping wheelbarrows, capacity 1.4 m3 | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOPU | Narrow gauge platforms | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAME | Pneumatic jackhammers for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption 0.45 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_TOKAME | Supports for portable pneumatic perforators | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||