AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | lb | ||||||||||
| KAME-LI-MESA-KALI_KAKAMERI | Plastic dowels with screws, diameter 0.472 in, length 2.76 in, screw diameter 0.315 in, screw length 2.76 in | 100 EA | ||||||||||
| KATO-ME-KAME-KAME_KAKAKARI | G-3 construction gypsum | ton | ||||||||||
| KATO-RI-KAME-KAME_KAKAKATO | Portland cement without additives for general construction CEM 0 42.5N | ton | ||||||||||
| MEME-RI-KAPU-KAPU_KAKAKAPU | Cones of coniferous species (spruce, pine) for holes, diameter 1.97 in | 100 EA | ||||||||||
| RITO-TO-KANE-KAPU_KAKAMEME | Non-galvanized welded steel pipes for water and gas pipelines with threads, light, nominal diameter 1.97 in, wall thickness 0.118 in | LF | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||