AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_RIKA | Worker Category 1 | hrs | ||||||||||
| KAME-PU-KAME-KANE_KAKAKARI | Hardened steel working teeth, pressure at the ends of the teeth 350 bar | set | ||||||||||
| KAME-PU-KARI-KATO_KAKAKAPU | Hardened steel universal blades for hydraulic shears, force generated by blades 716.50 ton, blade length 20.67 in | set | ||||||||||
| DXME-KAME-KASA_KADXKA | Diesel crawler excavators with a set of equipment for dismantling reinforced concrete structures, boom length 91.9 ft, excavator weight 143.30 ton | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_KADXSA | Hydraulic shears for breaking up reinforced concrete structures based on a crawler excavator weighing 35-50 tons, compression force 1000-1200 kN | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_SAMEVO | Single-bucket diesel excavators on crawler tracks, bucket capacity 1.8 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||