Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Drilling of non-circular tunnels up to 215 SF using the continuous face method without drilling frames with monolithic lining and temporary support with reinforced concrete lining without dismantling in soils of the group, 9

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/