AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KAME-KATO | Drill bits | EA | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEDX-KADX_KAKARIME | Rubber-fabric pressure hose for water with a pressure of 1 MPa (10 kgf/cm2), inner diameter 0.630 in | LF | ||||||||||
| KAVO-TO-KASA-KARI_KAKAKAME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 47.24-118.11 in, thickness 0.354-0.472 in | ton | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 47.24-118.11 in, thickness 0.039-0.315 in | ton | ||||||||||
| DXME-KAPU-KATO_KAMEME | Impact-rope drilling rigs on wheeled chassis, drilling depth up to 164.0 ft, load capacity 2.6 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKALI | Gantry cranes, lifting capacity 71.65 ton, hook lifting height 78.7 ft | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKALI | Electricity: consumption 21.12 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAPU | Mobile screw compressors with internal combustion engines, pressure up to 1 MPa (10 atm), capacity up to 13.1 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KAPURI | Multi-stage centrifugal pumps with electric drive, flow rate 78.5 CY/h, head 541.3 ft | Machine hours | ||||||||||
| PU_MEKAKA_KARIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MERI_KAPURI | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||