AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-TO-KAVO-KARI | Angle steel | ton | ||||||||||
| KAVO-PU-KATO-KATO | Periodic profile reinforcing steel | ton | ||||||||||
| MEME-ME-KATO-KANE | Edged boards | CY | ||||||||||
| RITO-SA-KARI-KARI | Steel pipes | LF | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-MESA-KATO_MEKAKAPU | Bolts for mounting steel structures, complete with nuts and washers, diameter 0.236-0.315 in, length 2.17-3.15 in | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAKARIME | Fireproof impregnated canvas | SF | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | ton | ||||||||||
| KAVO-ME-KARI-MELI_KAKATOME | Single woven steel mesh made of uncoated wire with diamond-shaped cells, wire diameter 1.2 mm, cell size 10x0.394 in | SF | ||||||||||
| KAVO-RI-KARI-MENE_KAKAMEME | Steel reinforcement ropes | lb | ||||||||||
| KAVO-TO-KATO-KANE_KAKAMERI | Low-carbon steel knitting wire | ton | ||||||||||
| KAVO-TO-KANE-KAME_KAKARIPU | Hot-rolled corrugated steel sheet, steel grades St3sp, St3ps, thickness 0.079-0.236 in | ton | ||||||||||
| MEME-ME-KARI-KAME_KAKAMERI | Round coniferous timber, debarked, length 3-6.5 m, diameter 14-24 cm, grade I-III | CY | ||||||||||
| DXME-KATO-KANE_KARIRI | Wheeled-rail loading machines for horizontal workings with a cross-section of more than 86.1 SF, pneumatic | Machine hours | ||||||||||
| DXME-KATO-KAVO_KAKATO | Portable column drills for drilling holes and wells when working from stationary compressor stations | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to 9.81 kN (1.10 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electric winches with a pulling force of up to 49.05 kN (5.51 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANETO | Electricity: consumption 0.53 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKARI | Non-tipping wheelbarrows, capacity 1.4 m3 | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKATO | Tipping wagons, capacity 0.8 m3 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAME | Pneumatic jackhammers for use with stationary compressor stations | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Combined electric press shears, nominal force 630 kN, power 7 HP (5 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Electricity: consumption 1.58 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption 0.45 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||