AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-TO-MEKA-KARI | Shaped profiles for sheet pile piles | ton | ||||||||||
| ME_MEKAKA_TODX | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | ton | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIVO | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 20B-60B | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length 2-6.5 m, width 3.94 in and above, thickness 3.94 in and above, grade III | CY | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | lb | ||||||||||
| DXME-KARI-KAME_KAKATO | High-frequency electric vibratory pile drivers for driving piles up to 1.5 t, eccentric moment 47 kgm, centrifugal force 450 kN | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAME_KAKATO | Electricity: consumption 19.8 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electric winches with a pulling force of up to 12.26 kN (1.25 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEME | Electricity: consumption 0.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEKA-KASA_KAKALI | Pipe layers, nominal load capacity 12.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 13.23 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 16.53 ton | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||